EEMIS Site


EEMIS Site was custom designed for the Exploration Industry. It is a Drillpad, Access track design Earthworks management tool. It allows Earthworks managers and Field supervisor to keep track of multiple dozers and heavy plant production and partial completion of multiple Drill stringlines. It guides operators to the next pad and status of whether it is completed or partial completed, whilst displaying to operator the distance and bearing of Cultural sites in his work area as well as nearest distance to corridor edge. The system can keep track of unlimited number of Dozers, Rock breakers, Graders, Rubber tyred Front bucket loaders . At present 30 heavy plant units at multiple resources sites over 500square Km is in practice.


Inbuilt into the system is Cultural Site avoidance whilst the dozers are pushing tracks and pads and the ability to set GDP corridors and boundaries. A 10metre buffer to edge is normal and if the Dozer or heavy plant reaches the Edge of “NoGo” areas, a Piezo alarm sound in the cab. Status of all sites can be downloaded into Company wide Exploration Management software database for daily production reports or Geotechnical software such as acQuire. Some important features are Cultural Heritage site avoidance. Drill Pads done or partial completed. Rehab areas completed or partial completed. Continuous tracklog to display where the heavy equipment has travelled. The system can be coordinated with DrillGenie our Virtual Peg Drill Hole guidance system to further improve productivity and safety

More information or for a free demonstration Click HERE….